DRILLED SOLDIER PILE RETAINING WALL
DRILLED SOLDIER PILE RETAINING WALL Effective: September 20, 2001 Revised: October 5, 2015 Description. This work shall consist of providing all labor, materials, and equipment necessary to fabricate and furnish the soldier piles, create and maintain the shaft excavations, set and brace the soldier piles into position and encase the soldier piles in concrete to the specified elevation. Also ...
Continue Reading...